Specials

All specials

API 13C REDLINE : 2010

API 13C REDLINE : 2010

RECOMMENDED PRACTICE ON DRILLING FLUIDS PROCESSING SYSTEMS EVALUATION

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

API Foreword
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions, symbols and abbreviated
   terms
4 Requirements
5 Drilled solids removal - System performance
6 Rigsite evaluation of drilled-solids management
   equipment
7 Practical operational guidelines
8 Conductance of shale-shaker screens
9 Shale-shaker screen designation
10 Non-blanked area of shale-shaker screen panel
11 Shale shaker screen labelling
Annex A (informative) - Derivation of capture equation
Annex B (informative) - Finder's method
Bibliography

Abstract

Gives a standard procedure for assessing and modifying performance of solids control equipment systems commonly used in the field in petroleum and natural gas drilling fluids processing.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute

Contact us