API 19B : 2006 : R2012
API 19B : 2006 : R2012
RECOMMENDED PRACTICES FOR EVALUATION OF WELL PERFORATORS
American Petroleum Institute
RECOMMENDED PRACTICES FOR EVALUATION OF WELL PERFORATORS
American Petroleum Institute
0 SCOPE
1 EVALUATION OF PERFORATING SYSTEMS UNDER SURFACE
CONDITIONS, CONCRETE TARGETS
2 EVALUATION OF PERFORATORS UNDER STRESS CONDITIONS, BEREA
TARGETS
3 EVALUATION OF PERFORATOR SYSTEMS AT ELEVATED TEMPERATURE
CONDITIONS, STEEL TARGETS
4 EVALUATION OF PERFORATION FLOW PERFORMANCE UNDER
SIMULATED DOWNHOLE CONDITION
5 DEBRIS COLLECTION PROCEDURE FOR PERFORATING GUNS
6 Evaluation of Perforator Systems to Determine Swell
REFERENCES
APPENDIX A
Defines standard procedures for evaluating the performance of perforating equipment so that representations of this performance may be made to the industry under a standard practice.
Document Type | Standard |
Status | Current |
Publisher | American Petroleum Institute |
ProductNote | Reconfirmed 2012 |