API 11S7 : 1993 : R2008

API 11S7 : 1993 : R2008

RECOMMENDED PRACTICE ON APPLICATION AND TESTING OF ELECTRIC SUBMERSIBLE PUMP SEAL CHAMBER SECTIONS

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

POLICY
FOREWORD
SECTION 1 - GENERAL
1.1 Introduction
1.2 Scope
SECTION 2 - DEFINITIONS
SECTION 3 - FUNCTIONS OF THE SEAL CHAMBER SECTION
3.1 General
3.2 Provide Oil Expansion Volume
3.3 Pressure Equalization
3.4 Exclude Well Fluids
3.5 Thrust Compensation
3.6 Torque Transmittal
SECTION 4 - COMPONENTS
4.1 Shaft
4.2 Shaft Seals
4.3 Static Seals
4.4 Bearings
4.5 Bladder
4.6 Housings
4.7 Labyrinth Chamber
4.8 Blocking Fluid
4.9 Bladder Chamber
4.10 Relief Valves
4.11 Check Valves
4.12 Couplings
SECTION 5 - APPLICATION AND SELECTION CONSIDERATIONS
5.1 Temperature
5.2 Fluid Characteristics
5.3 Well Geometry
5.4 Equipment
5.5 Operating Conditions
SECTION 6 - ACCEPTANCE TESTING
6.1 Shafts
6.2 Shaft Seals, Joints and Vents
6.3 Idle Power Loss
6.4 Relief Valves
6.5 Bladder Pressure Test
SECTION 7 - SUPPLEMENTAL VIBRATION TESTING
SECTION 8 - RE-USE TESTING
8.1 Check for Leaks
8.2 Thrust Load Testing
8.3 Tests
SECTION 9 - TEARDOWN ANALYSIS
9.1 Purpose
9.2 General Component Analysis
9.3 Additional Checks
SECTION 10 - HANDLING, SHIPPING, AND STORAGE
10.1 Shipping
10.2 Handling
10.3 Storage

Abstract

Covers testing, failure evaluation information and tutorial. Gives a general understanding of functioning and construction of seal chamber sections and identification of system requirements and characteristics, well conditions that influence component application and selection.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute
ProductNote Reconfirmed 2008

Contact us