API 95J : 2006 : R2008
API 95J : 2006 : R2008
GULF OF MEXICO JACKUP OPERATIONS FOR HURRICANE SEASON
American Petroleum Institute
GULF OF MEXICO JACKUP OPERATIONS FOR HURRICANE SEASON
American Petroleum Institute
1 Scope
2 Overview
3 Terms and Definitions
4 Site
5 Preloading Process
6 Air Gap
7 Unit Preparations and Evacuation
8 Post-storm Recovery
9 Post-storm Inspections
Annex A
Annex B
Annex C
Annex D
Describes an approach to siting Jackup Mobile Offshore Drilling Units (MODUs) and to recommend certain operational procedures to enhance jackup survivability and stationkeeping during hurricane season in the Gulf of Mexico during drilling, workover, and while stacked (idled) at a non sheltered location.
Document Type | Standard |
Status | Current |
Publisher | American Petroleum Institute |
ProductNote | Reconfirmed 2008 |