IEC 62381 Ed. 3.0 b:2024

IEC 62381 Ed. 3.0 b:2024 Automation systems in the process industry – Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

standard by International Electrotechnical Commission , 07/01/2024

More details

Download


$348.00

Full Description

This International Standard defines requirements and checklists for the factory acceptance test (FAT), the factory integration test (FIT), the site acceptance test (SAT), and the site integration test (SIT). These tests are carried out to demonstrate that the automation system meets the requirements of the applicable specification.

This document provides a means for all parties, including the owner, the buyer, and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities specified in this document can be used to develop test plans adapted to the specific requirements of the process/plant/equipment.

The annexes of this document contain checklists which are available for consideration when preparing specific test procedures and documentation for a specific automation system.