API 16ST : 2009
API 16ST : 2009
COILED TUBING WELL CONTROL EQUIPMENT SYSTEMS
American Petroleum Institute
COILED TUBING WELL CONTROL EQUIPMENT SYSTEMS
American Petroleum Institute
1 Scope
1.1 General
1.2 Operations Not Covered in this Document
2 Normative References
3 Terms and Definitions
4 Well Control Equipment
4.1 General
4.2 Coiled Tubing (CT) Operations
4.3 Well Control Components
4.4 Additional Well Control Components
4.5 Well Control Equipment for Hydrogen Sulfide Service
5 CT String and Connectors
5.1 CT String
5.2 CT String Selection
5.3 CT Collapse
5.4 Bend Cycle Fatigue
5.5 CT String Management
6 Downhole Flow Check Assembly
6.1 General
6.2 CT Bottomhole Assembly (BHA) Connectors
6.3 Downhole Flow Check Devices
7 Elastomers and Seals
7.1 General
7.2 Rapid Gas Decompression (RGD)
7.3 Chemical Compatibility
7.4 Temperature Performance Range
7.5 Extrusion Resistance
7.6 Abrasion/Erosion Resistance
7.7 Pressure Rating
7.8 Other Considerations
8 Choke Manifolds and Choke Lines
8.1 Purpose
8.2 Choke Line Installation
8.3 Choke Manifold Installation
9 Kill Lines
9.1 Purpose
9.2 Kill Line Installation
9.3 Bleed-off Lines
10 Pump Lines
10.1 Purpose
10.2 Pump Line(s) Installation
10.3 Reel Swivel
10.4 Bleed-off Lines
11 General Description of CT Surface Equipment
11.1 General
11.2 Typical CT Unit Components
11.3 Injector
11.4 Tubing Guide Arch
11.5 Reel
11.6 Power Supply/Prime Mover
11.7 Monitoring Equipment
12 Well Control Equipment Testing
12.1 General
12.2 Performance Testing - Slip and Shear Rams
12.3 Performance Load Test - Flow Check Assembly Connector
12.4 Pressure Testing
12.5 Test Documentation
12.6 General Testing Considerations
12.7 Pressure Test Devices
13 Well Control Equipment Operating System
13.1 General
13.2 Functional Requirements
13.3 Well Control Equipment Operating System Components
13.4 Reservoir
13.5 Pump System and Pump Sizing
13.6 Accumulator Bank and Accumulator Sizing
13.7 Control Panel and Manifold
13.8 Hydraulic Control Fluid
14 Pre-job Planning and Preparation
14.1 General
14.2 Well Control Contingencies
14.3 Job Planning
14.4 Location - Equipment Layout
14.5 Personnel Requirements
14.6 Job Review
14.7 Equipment Rig-up Considerations
14.8 CT Service Considerations
Annex A (informative) - Accumulator Sizing Calculations
Annex B (informative) - CT Well Control Contingencies and Drills
Bibliography
Describes coiled tubing well control equipment assembly and operation as it relates to well control practices.
Document Type | Standard |
Status | Current |
Publisher | American Petroleum Institute |
ProductNote | Reconfirmed 2009 |