API 1172 : 2014

API 1172 : 2014

RECOMMENDED PRACTICE FOR CONSTRUCTION PARALLEL TO EXISTING UNDERGROUND TRANSMISSION PIPELINES

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

1 Scope
2 Normative References
3 Terms, Definitions, Acronyms, and Abbreviations
4 Parallel Construction Excavation Damage Prevention
  Guidelines
5 Preliminary Design
6 Final Design
7 Preconstruction Activities
8 Construction Activities
9 Post-construction Activities
Annex A (informative) - Planning and Design Review
        Meeting(s) Agenda
Annex B (informative) - Post-construction Review and
        Lessons Learned Meeting Agenda

Abstract

Acts as a resource to assist all parties to safely manage construction activities of new or modified facilities parallel to existing underground transmission pipelines.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute

Contact us