IEC 62117 : 1.0

IEC 62117 : 1.0

NUCLEAR REACTOR INSTRUMENTATION - PRESSURIZED LIGHT WATER REACTORS (PWR) - MONITORING ADEQUATE COOLING WITHIN THE CORE DURING COLD SHUTDOWN

International Electrotechnical Committee

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

FOREWORD
INTRODUCTION
1 Scope and object
2 Normative references
3 Definitions and abbreviations
4 Operational conditions
      4.1 General
      4.2 Cold shutdown maintenance operations
      4.3 Cold shutdown refuelling operation
5 Measurement methods
      5.1 General
      5.2 RPV water level measuring devices
             5.2.1 Differential pressure measurement
             5.2.2 Heated sensor measurement
      5.3 RPV outlet pipe water level measuring devices
             5.3.1 Differential pressure measurement
             5.3.2 Ultrasonic liquid level monitoring
      5.4 Core exit temperature sensing devices
             5.4.1 Core exit thermocouples
             5.4.2 RPV outlet pipe temperature
             5.4.3 RHRS temperature
6 Instrumentation requirements
      6.1 General requirements
             6.1.1 Safety classification
             6.1.2 Accuracy and response time
             6.1.3 Reliability
             6.1.4 Single failure considerations
      6.2 Differential pressure measurement
             6.2.1 Differential pressure transmitters
             6.2.2 Reference columns
             6.2.3 Differential pressure tap locations
             6.2.4 Hydraulic instrument line installations
             6.2.5 Hydraulic instrument line temperature
             6.2.6 Type and quality of the fluid in the
                      instrument lines
      6.3 Heated sensor measurement
      6.4 Ultrasonic liquid level measurement
             6.4.1 Application
             6.4.2 Accuracy and time response
             6.4.3 Installation considerations
             6.4.4 Special human machine considerations
      6.5 Temperature sensing devices
7 Data processing
8 Presentation of information
9 Verification and calibration
10 In-service testing and maintenance
11 Qualification
12 Documentation
Annex A (informative) Loss of core cooling events during
                      cold shutdown at PWRs
Annex B (informative) Plant operating states

Abstract

Gives requirements for instrumentation to monitor core cooling for safe operation of PWRs during cold shutdown operations when the coolant temperature is below 100 degree C. Summarizes good international practices to be used when designing new or upgrading existing PWR core cooling monitors.

General Product Information

Document Type Standard
Status Current
Publisher International Electrotechnical Committee
Committee TC 45