IEC 62382 : 2.0
IEC 62382 : 2.0
CONTROL SYSTEMS IN THE PROCESS INDUSTRY - ELECTRICAL AND INSTRUMENTATION LOOP CHECK
International Electrotechnical Committee
CONTROL SYSTEMS IN THE PROCESS INDUSTRY - ELECTRICAL AND INSTRUMENTATION LOOP CHECK
International Electrotechnical Committee
FOREWORD<br>INTRODUCTION<br>1 Scope<br>2 Normative references<br>3 Terms, definitions and abbreviated terms<br>4 Order of loop check and cold commissioning<br> in the project schedule<br>5 Loop check content<br>6 Loop check procedure <br>7 Documents and test sheets<br>8 Quality assurance<br>9 Safety aspects<br>Annex A (informative) - Test report for analogue input loop <br>Annex B (informative) - Test report for binary input loop<br>Annex C (informative) - Test report for analogue output loop <br>Annex D (informative) - Test report for binary output loop <br>Annex E (informative) - Test report for motors and variable <br> frequency drives
Defines the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning.
Document Type | Standard |
Status | Current |
Publisher | International Electrotechnical Committee |
Committee | TC 65 |
Supersedes |
|