SAE ARP 1925 : 2016
SAE ARP 1925 : 2016
AUTOMATED BRUSH DEBURRING
SAE International
1. SCOPE
2. APPLICABLE DOCUMENTS
3. TECHNICAL REQUIREMENTS
4. RECOMMENDED BRUSH CONSTRUCTION
5. PROCESS PARAMETERS
6. QUALITY ASSURANCE PROCEDURES
7. ENVIRONMENTAL CONSIDERATIONS
8. QUALITY ASSURANCE CONSIDERATIONS
9. NOTES
Sets up a procedure for the application of long string abrasive monofilaments to machined aircraft structures for the purpose of removing burrs produced during the machining operations.
Document Type | Standard |
Status | Current |
Publisher | SAE International |
Committee | AMS-B |