IEEE C57.113 : 2010

IEEE C57.113 : 2010

RECOMMENDED PRACTICE FOR PARTIAL DISCHARGE MEASUREMENT IN LIQUID-FILLED POWER TRANSFORMERS AND SHUNT REACTORS

Institute of Electrical & Electronics Engineers

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

1. Overview
2. Normative references
3. Definitions
4. Specification of PD measuring circuits
5. PD test procedure
Annex A (informative) - Design of PD coupling units
Annex B (informative) - Response of PD measuring instruments
Annex C (informative) - Calibration of PD measuring circuits
Annex D (informative) - Basic sensitivity check
Annex E (informative) - Bushing tap ratio measurement
Annex F (informative) - Noise identification
Annex G (informative) - PD pattern recognition
Annex H (informative) - Bibliography

Abstract

Specifies the test procedure for the detection and measurement by the wideband apparent charge method of partial discharges (PDs) occurring in liquid-filled power transformers and shunt reactors during dielectric tests, where applicable.

General Product Information

Document Type Standard
Status Current
Publisher Institute of Electrical & Electronics Engineers

Contact us