IEEE 1185 : 2010
IEEE 1185 : 2010
RECOMMENDED PRACTICE FOR CABLE INSTALLATION IN GENERATING STATIONS AND INDUSTRIAL FACILITIES
Institute of Electrical & Electronics Engineers
RECOMMENDED PRACTICE FOR CABLE INSTALLATION IN GENERATING STATIONS AND INDUSTRIAL FACILITIES
Institute of Electrical & Electronics Engineers
1. Overview
2. Normative references
3. Definitions, acronyms, and abbreviations
4. Cable pulling recommendations
5. Raceway cable fill recommendations
6. Cable installation recommendations
7. Conduit-cable pulling charts
8. Cable pulling attachment methods
9. Pull rope and tape selection
10. Cable lubrication
11. Tension-limiting methods
12. Cable pullbys and pushbys
13. Pullbacks
14. Installation of specialty cables
15. Installation of armored cable
16. Duct bank cable pulls
17. Vertical cable support
18. Acceptance testing of installed cables
Annex A (normative) - Conduit-cable pulling charts
Annex B (informative) - Use of conduit-cable pulling
chart examples
Annex C (informative) - Conduit-cable pulling chart
methodology
Annex D (informative) - Conduit-cable pulling chart
bend correction factor
Annex E (informative) - Glossary
Annex F (informative) - Bibliography
Covers guidance for wire and cable installation practices in generating stations and industrial facilities.
Document Type | Standard |
Status | Current |
Publisher | Institute of Electrical & Electronics Engineers |