IEEE C37.122.6 : 2013

IEEE C37.122.6 : 2013

RECOMMENDED PRACTICE FOR THE INTERFACE OF NEW GAS-INSULATED EQUIPMENT IN EXISTING GAS-INSULATED SUBSTATIONS RATED ABOVE 52 KV

Institute of Electrical & Electronics Engineers

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

1 Scope
2 Normative references
3 Definitions
4 General
5 Specific requirements during initial stage
  of GIS project
6 Specific requirements during extension
  GIS project
7 Recommended practice for GIS interface
8 Responsibility
Annex A (informative) - Standard GIS interface
        for extensions anticipated from initial
        stage
Annex B (informative) - GIS interface for extensions
        not anticipated from initial stage
Annex C (informative) - Bibliography

Abstract

Provides the recommended practices for designing and installing the interfaces between existing gas-insulated substation (GIS) equipment and new GIS equipment that is added at a later date and may be of different design and of different manufacturer.

General Product Information

Document Type Standard
Status Current
Publisher Institute of Electrical & Electronics Engineers
Supersedes
  • IEEE 1416 : 1998

Contact us