ASME POM 101 : 2013
ASME POM 101 : 2013
PERFORMANCE-RELATED OUTAGE INSPECTIONS
American Society of Mechanical Engineers
PERFORMANCE-RELATED OUTAGE INSPECTIONS
American Society of Mechanical Engineers
Foreword
Committee Roster
Correspondence With the PTC Committee
Introduction
1 Object and Scope
2 Acronyms
3 Guiding Principles
4 Specific Equipment Considerations
5 Instruments and Methods of Measurement
6 Report of Results
Nonmandatory Appendices
A - Air Heater (Tubular)
B - Blowdown Tank
C - Condenser Steam Side
D - Condenser Water Box and Tube-Side Inspection Guidelines
E - Cooling Tower Outage Inspection Guidelines
F - Electrostatic Precipitator
G - Feedwater Heaters and Deaerators
H - Heat Recovery Steam Generators
I - Boiler Setting Air In-Leakage and Regenerative (Rotary)
Air Heater Inspection Guidelines
J - Boiler Steam- and Water-Side Outage Inspection Guidelines
K - Safety Considerations
Gives guidelines for equipment inspections of power plants using fossil fuels during shutdown or outage periods.
Document Type | Standard |
Status | Current |
Publisher | American Society of Mechanical Engineers |