ASME PTC70 : 2009
ASME PTC70 : 2009
RAMP RATES
American Society of Mechanical Engineers
Notice
Foreword
Committee Roster
Correspondence With the PTC Committee
Section 1 - Object and Scope
Section 2 - Terms and Definitions
Section 3 - Guiding Principles
Section 4 - Instrumentation and Methods of Measurement
Section 5 - Computation of Results
Section 6 - Test Uncertainty
Section 7 - Reporting of Results
Nonmandatory Appendices
A - Sample Uncertainty Calculation
B - Sample Ramp Rate Data and Calculation
Describes the procedures, direction, and guidance for the accurate determination, via testing, of the maximum repeatable load change ramp rate, startup load change rate or shutdown load change rate of a power plant.
Document Type | Standard |
Status | Current |
Publisher | American Society of Mechanical Engineers |
ProductNote | Reconfirmed 2009 |