ASME NOG 1 : 2015
ASME NOG 1 : 2015
RULES FOR CONSTRUCTION OF OVERHEAD AND GANTRY CRANES (TOP RUNNING BRIDGE, MULTIPLE GIRDER)
American Society of Mechanical Engineers
RULES FOR CONSTRUCTION OF OVERHEAD AND GANTRY CRANES (TOP RUNNING BRIDGE, MULTIPLE GIRDER)
American Society of Mechanical Engineers
Foreword
Committee Roster
Preparation of Technical Inquiries to the Committee on
Cranes for Nuclear Facilities
Summary of Changes
Section 1000 - Introduction
Section 2000 - Quality Assurance
Section 3000 - Coatings and Finishes
Section 4000 - Requirements for Structural Components
Section 5000 - Mechanical
Section 6000 - Electrical Components
Section 7000 - Inspection and Testing
Section 8000 - Packaging, Shipping, Receiving, Storage, and
Handling
Section 9000 - Planned Engineered Lifts
Mandatory Appendix
I - Additional Requirements
II - Criteria Required for Structural Qualification of an
Existing Crane Bridge for Use With an ASME NOG-1 Type
I Hoist and Trolley
Nonmandatory Appendices
A - Recommended Practices
B - Commentary
C - NUREG-0554/ASME NOG-1 Conformance Matrix
Describes electric overhead and gantry multiple girder cranes with top running bridge and trolley used at nuclear facilities and components of cranes at nuclear facilities.
Document Type | Standard |
Status | Current |
Publisher | American Society of Mechanical Engineers |