API 554-3 : 2008

API 554-3 : 2008

PROCESS CONTROL SYSTEMS - PROJECT EXECUTION AND PROCESS CONTROL SYSTEM OWNERSHIP

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

1 Scope
  1.1 Document Organization
2 Referenced Publications
3 Definitions
4 Scope and Objectives
5 Project Planning
  5.1 Define/Execute Project Scope
6 Project Execution
  6.1 Overview
  6.2 Resources and Staffing
  6.3 Standards and Practices
  6.4 Design Data Management
  6.5 Procurement
  6.6 Physical Design
  6.7 Construction
  6.8 Training
  6.9 Testing, Validation and Commissioning
  6.10 Project Close Out
7 Testing, Validation and Commissioning
  7.1 Planning
  7.2 Main Process Control System
  7.3 Field Installations
  7.4 Tie-ins and Hot Cut Overs
  7.5 Other Systems
  7.6 Commissioning
  7.7 Acceptance
8 Operation and Maintenance
  8.1 Management of Change
  8.2 Operations
  8.3 Maintenance Support
  8.4 Engineering and Technical Support
  8.5 Testing Schedules
  8.6 Documentation
  8.7 Inspection, Calibration, Test and Repair Records
  8.8 Maintenance, Operation and Repair Manuals
  8.9 Spare Parts

Abstract

Describes the processes required to successfully implement process control systems for refinery and petrochemical services.