API 17G : 2006 : R2011

API 17G : 2006 : R2011

RECOMMENDED PRACTICE FOR COMPLETION/WORKOVER RISERS

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

API Foreword
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions, abbreviated terms and symbols
4 System requirements
5 Functional requirements
6 Design requirements
7 Materials and fabrication
8 Testing
9 Marking, storage and shipping
10 Inspection, maintenance, reassessment and monitoring
11 Documentation
Annex A (informative)- Standardization of the C/WO riser
        interface (vertical tree)
Annex B (informative) - Operational modes and global riser
        system analysis
Annex C (informative) - Fatigue analysis and assessment
Annex D (normative) - Structural resistance methods
Annex E (informative) - Example calculations for pipe pressure
        design
Annex F (informative) - Purchasing guideline
Annex G (informative) - Bolt preload
Annex H (informative) - Seals
Annex I (normative) - Qualification of connectors
Bibliography

Abstract

Describes requirements and recommendations for the design, analysis, materials, fabrication, testing and operation of subsea completion/workover (C/WO) riser systems run from a floating vessel.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute
ProductNote Reconfirmed 2011

Contact us