API 17G : 2006 : R2011
API 17G : 2006 : R2011
RECOMMENDED PRACTICE FOR COMPLETION/WORKOVER RISERS
American Petroleum Institute
RECOMMENDED PRACTICE FOR COMPLETION/WORKOVER RISERS
American Petroleum Institute
API Foreword
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions, abbreviated terms and symbols
4 System requirements
5 Functional requirements
6 Design requirements
7 Materials and fabrication
8 Testing
9 Marking, storage and shipping
10 Inspection, maintenance, reassessment and monitoring
11 Documentation
Annex A (informative)- Standardization of the C/WO riser
interface (vertical tree)
Annex B (informative) - Operational modes and global riser
system analysis
Annex C (informative) - Fatigue analysis and assessment
Annex D (normative) - Structural resistance methods
Annex E (informative) - Example calculations for pipe pressure
design
Annex F (informative) - Purchasing guideline
Annex G (informative) - Bolt preload
Annex H (informative) - Seals
Annex I (normative) - Qualification of connectors
Bibliography
Describes requirements and recommendations for the design, analysis, materials, fabrication, testing and operation of subsea completion/workover (C/WO) riser systems run from a floating vessel.
Document Type | Standard |
Status | Current |
Publisher | American Petroleum Institute |
ProductNote | Reconfirmed 2011 |