API HUMAN FACTORS TASK FORCE : 2006

API HUMAN FACTORS TASK FORCE : 2006

HUMAN FACTORS IN NEW FACILITY DESIGN TOOL

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

Purpose
Scope
Applicability
Structure of Tool
How to Use the Tool
Economic Discussion
Application of Tool in Existing Facilities
1. Alarm Management
2. Blinds and Blanks
3. Control House Ergonomics
4. Electrical Substations and Field Housing for Instruments
5. Emergency Equipment
6. Field Analyzer Buildings
7. Field Display Panels
8. Filters
9. Furnaces and Fired Heaters
10. Instrumentation Systems
11. Labeling/Signage of Process Equipment
12. Loading/Unloading Facilities
13. Pumps and Compressors
14. Reactors/Dryers
15. Sample Points
16. Structural: Ladders, Stairs, Guards, and Handrails
17. Tanks
18. Valves
19. Vessels (including Heat Exchangers)
20. Work Environment: Lighting, Noise, Heating/Cooling
Glossary
References
Figures

Abstract

Focuses only on equipment design. Also covers equipment that is common to both upstream producing and downstream manufacturing operations.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute

Contact us