Specials

All specials

API MPM CH20.5 : 2017

API MPM CH20.5 : 2017

MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 20.5: RECOMMENDED PRACTICE FOR APPLICATION OF PRODUCTION WELL TESTING IN MEASUREMENT AND ALLOCATION

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

1 Scope
2 Normative References
3 Terms, Definitions, Acronyms, Abbreviations,
  and Symbols
4 Production Well Testing in Upstream Measurement
  and Allocation
5 Conducting a Production Well Test
6 Calculating Production Well Test Volumes and Rates
7 Applying Production Well Test Data for Use in Allocation
Annex A (informative) - Types of Oil and Gas Well Tests
Annex B (informative) - Description of the Production Well
        Test System
Annex C (informative) - Example Analysis for Establishing
        Production Well Test Duration During
        Nonstable Flow Conditions
Annex D (informative) - Example Production Well Test
        Report
Annex E (informative) - Field Determination of Oil Volume
        Correction Factor
Annex F (informative) - Calculation of Water Volume
        Correction Factor
Annex G (informative) - Example Calculations of Production
        Well Test Rates
Annex H (informative) - Example Calculations of Production
        Well Test Use in Allocation
Bibliography

Abstract

Gives recommendations and guidelines for the application of production well testing in production measurement and allocation.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute

Contact us