API 2HINS : 2009

API 2HINS : 2009

GUIDANCE FOR POST-HURRICANE STRUCTURAL INSPECTION OF OFFSHORE STRUCTURES

American Petroleum Institute

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$34.32

$78.00

(price reduced by 56 %)

Table of Contents

Introduction
1 Scope
2 Acronyms
3 Organization of Document
4 Inspection Initiators
  4.1 General
  4.2 Assessment Process
  4.3 Engineering Check
  4.4 Prioritizing Structures for Inspection
5 Special Above-water Inspection
  5.1 General
  5.2 Initial Evaluation for Boarding
  5.3 Above-water General Visual Inspection
  5.4 Indicators for Special Below-water Inspection
  5.5 Safety
  5.6 Environmental
  5.7 Pre-planning
6 Special Below-water Inspection of Fixed Structures
  6.1 General
  6.2 Primary Structure
  6.3 Risers, Appurtenances, and Secondary Structure
7 Special Below-water Inspection of Floating Structures
  7.1 General
  7.2 External Structure
  7.3 Internal Structure
8 Documentation
  8.1 Inspection Results
  8.2 Damage
Bibliography

Abstract

Gives guidance for post-hurricane, above and below water, structural inspections of fixed and floating structures located in the Gulf of Mexico.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute

Contact us